EN
CN
Image Name
Smart Innovations Lead Hydropower Toward Green and High-End Development

应用领域

Solution Value

Intelligent Control

It achieves deep integration of primary and secondary systems, enabling more efficient data transmission.By optimizing control processes and reducing equipment complexity, it significantly improves overall system performance, delivering a smarter and more convenient user experience.

Safe and Reliable

It features exceptional environmental adaptability, ensuring stable operation in extreme weather conditions ranging from -40°C to 50°C.Modular design reduces maintenance difficulty and saves maintenance time.Multiple safety protection mechanisms deliver safety and minimize the risk of accidents.

Cost Reduction and Empowerment

By optimizing equipment selection and integration, construction costs can be reduced by approximately 25%.The compact layout design can reduce the footprint by 30%, while the use of prefabricated components and efficient construction processes can significantly shorten the project timeline, enabling rapid deployment.

Ecological Priority

Based on an ecological-first design philosophy, the solution allows for the continuity of aquatic ecosystems through engineering measures such as fishway construction. While fulfilling energy transmission functions, it also preserves biodiversity and promotes the coordinated development of hydropower and ecological environments.

相关产品

//分类tab
//分类循环体 //分类循环体结束

成功案例

The Tianjin photovoltaic and energy storage project has achieved efficient utilization of "zero-carbon power" in industrial parks through photovoltaic and energy storage coordination and meteorological prediction systems.
The Household PV Project utilized TBEA’s TS36KTL model, which can operate stably in extreme cold environments with local temperatures as low as -30°C.
TBEA provides 304 MW low-frequency converter valves for the Low-frequency AC Transmission Project of Yuhuan-2 Offshore Wind Farm, which will help China achieve its goal of carbon neutrality by 2060.
300 MW Grid-Parity PV Power Plant
400 MW PV Power Plant in Guyuan County, Zhangjiakou City, Hebei Province.
150 MW Desert PV Power Plant in the Southeastern Mountain Pass Area.
TBEA provided an energy storage solution for Shandong Province’s first officially commercially operated independent electrochemical energy storage power station project.
TBEA provided a string-type EMS solution for the source-grid-load-storage project, with a project capacity of 30 MW/60 MWh.
Energy 100 MW PV and Energy Storage Project.
300 MW PV + 78 MW Energy Storage Project.
TBEA provided a 4.5 MW/4.5 MWh lithium iron phosphate energy storage system for 45 MW Wind Power Multi-energy Complementary Project.
TBEA provided a 15 MW/15 MWh energy storage solution for the Guyuan County 400MW PV + Demonstration Project.
TBEA provided four commercial and industrial energy storage units for the Industrial Park project in Wenzhou, with a total capacity of 400 kW/860 kWh.
TBEA supplied self-developed integrated commercial and industrial energy storage cabinets for the commercial and industrial energy storage project in Binzhou, Shandong Province
TBEA provided self-developed liquid-cooled battery cabinets for the distributed PV energy storage project in Hebei Province, with a total installed capacity of 6.77 MW/13.54 MWh.
TBEA’s Zero-carbon Park in Tianjin
TBEA’s Zero Carbon Industrial Park in Xi’an
Low-carbon Digital Park of Shenyang Transformer Group
Tieling Xifeng 100 MW Wind Power Project in Liaoning.
Tianmen Jingtan Township 100 MW Wind Power Project in Hubei.
Xilingol League 675 MW Wind Power Project.
Zhangbei 200 MW Wind Power Project.
Ganzhou Pingshanhu Million Kilowatt Wind Power Base 200MW Wind Power + Energy Storage Project.
Baotou household photovoltaic project utilizes the TBEA TS25/30KTL-A2 model. The local environment can reach a minimum temperature of -30℃, and the product can operate stably and effectively in extremely cold conditions.
The 200 MW Household PV Project in Tianmen, Xiantao, and Qianjiang, Hubei Province, used TBEA’s TS40KTL-A2 inverter.
The 50 MW Distributed PV Project in Suixi County, Huaibei City, Anhui Province introduced the TBEA TS40KTL-A2 inverter.
TBEA Xi’an Industrial Park Commercial and Industrial Project utilized TS50/100/150KTL commercial and industrial inverters, with a total installed capacity of 1 MW, saving the park electricity costs of RMB 1,000,000 annually.
TBEA provided the TS150KTL commercial and industrial inverter for the 1 MW distributed PV research and demonstration project in Linyi, Shandong.
TBEA provided the TS150KTL inverter for the 1.68 MW distributed project of Xinyi Glass under Shenzhen Golden Sun Program. Compared to the original 110 kW inverter, the project’s power generation increased by over 2%, while system costs were reduced by 7%.
TBEA Shandong Industrial Park invested in and built a demonstration project for building-integrated photovoltaics (BIPV).
TBEA constructed the 6.6 MW BIPV project for Shanghai Hongqiao High-Speed Railway Station.
TBEA constructed the 2.4 MW PV grid-connected project for Wuhan Railway Station.
Wuwei Wusheng 150 MW PV Power Plant, Gansu Province.
120 MW Agro-PV Power Plant in Hebei Province.
100 MW Grid-Connected PV Power Plant in Dunhuang City, Gansu Province
Shuchang Agro-PV Power Plant in Pingtang County
100 MW Liushuquan PV Power
Poyang Lake 120 MW Fishery-PV Power Plant
100 MW Agro-PV Power Plant in Yangxian, Shaanxi.
TBEA provided a 500 kV cable system solution for the expansion project of Shanghai Jing’an Substation, which is currently the world’s largest fully underground substation in terms of construction scale, designed transformation capacity, and voltage level.
TBEA provided a 500 kV cable system solution for the Power Transmission and Transformation Project,
TBEA provides high and low voltage switchgear for the distribution room renovation project.
Yunji Park Integrated Photovoltaic, Energy Storage, and Charging Demonstration Project.
TBEA Nanjing Branch Smart Power Distribution Room Project.
TBEA provided 10 kV switchgear, 0.4 kV switchgear, and distribution boxes for the key national infrastructure project, Chengdu Tianfu International Airport, during the “13th Five-Year Plan” period.
TBEA provided dry-type power transformer equipment for the Phase I project of Tianjin Metro Line 7.
TBEA supplied oil-immersed power main transformer equipment for Wuhan Metro Rail Transit Line 7.
TBEA provided dry-type traction rectifier transformer equipment for Shenzhen Metro Line 14.
TBEA provided dry-type traction rectifier transformer equipment for Changchun Urban Rail Transit Line 6.
TBEA provided dry-type power transformer equipment for Phases I and II of the Chuzhou-Nanjing Intercity Railway project.
TBEA provided dry-type traction rectifier transformers for Xiamen Metro Line 6.
TBEA provided 220kV protection and automation devices, 10kV protection and automation devices, and low-voltage intelligent instruments for the 100,000-ton polysilicon project.
TBEA developed China’s first set of 110 kV main load-side direct-compensation dry-type hollow series reactors for the Tangshan Qian’an 220 kV substation.
TBEA supplied China’s first 110 kV vegetable oil transformer for the 110 kV power transmission and transformation project in Zhejiang. This substation is the nation’s first full-lifecycle “carbon-negative” substation.
TBEA supplied a 500 kV transformer for the Fuzhou Lili Substation of Fujian Electric Power, which is Fujian’s first 500 kV smart substation and has been awarded the National Quality Engineering Prize.
TBEA provides 110kV transformers for the first batch of intelligent operation and maintenance pilot transformers for Southern Power Grid, as well as the first fully digitized construction substation - Guangzhou Lieqiao Substation.
TBEA Wudongde Power Transmission Guangdong Guangxi Ultra High Voltage Multi terminal DC Demonstration Project.
TBEA provided high-voltage shunt capacitor devices for the Zhalute-Qingzhou ±800 kV DC transmission project.
The 1000kV generator transformer independently developed by TBEA has been applied to the Power Plant.
TBEA provides 750kV on-site assembled generator transformers for power plants.
TBEA provided two generator transformers for the 2×1000MW unit project of the power plant
TBEA provided six power transformers for the 2×660MW unit project of the power plant.
TBEA provided two generator transformers for the 2×1000MW coal-fired power project.
TBEA provided six generator transformers for the 2×660MW unit project
The 800kV tank-type sulfur hexafluoride circuit breaker developed by TBEA is applied in power plants.
TBEA provided two generator transformers for the 2×660MW ultra-supercritical coal-fired unit project of the power plant.
TBEA provided generator transformers for the 1×1000MW coal-fired power plant project in Indonesia.
TBEA provided 550kV GIS for the thermal power plant unit project in Tajikistan.
TBEA provided all high-end converter transformers for the sending end of the industry's first ±1,100 kV UHVDC transmission project.
The 500 kV GIS product developed by TBEA has been applied in the Baihetan-Jiangsu ± 800 kV UHVDC transmission project for its expansion and reconstruction.
The industry's first ± 800 kV UHVDC converter transformer developed by TBEA has been applied in the ± 800 kV UHVDC transmission project.
TBEA provided AC filter bank reactors for the Yading-Jiangxi ± 800 kV DC transmission project.
TBEA provided the industry's first 1,000 kV UHVAC transformer and shunt reactor for the industry's first commercially operated 1,000 kV UHVAC demonstration project.
The 1,000 kV UHVAC autotransformer independently developed by TBEA has been applied in the 1,000 kV UHVAC demonstration project.
TBEA provided high-voltage shunt capacitor devices for the Yulin-Huaiyin 1,000 kV UHVAC transmission and transformation project .
The 1,000 kV UHVAC transformer independently developed by TBEA has been applied in the State Grid Sichuan-Chongqing 1,000 kV UHVAC interconnection project.
TBEA developed China's first SSP-H-860000/500 ultra-high-voltage, ultra-large-capacity combined transformer, which was deployed in the hydropower station project.
TBEA provided 500 kV hydropower unit transformers for the 16 × 1,000 MW hydropower station project at Baihetan.
TBEA provided 500 kV hydropower unit transformers for the 8 × 600 MW Jinping Second-Stage Hydropower Station on the Yalong River.
The ZF53-550(L)Y4000, 5000-63 gas-insulated metal-enclosed switchgear developed by TBEA has been applied to the Jinchuan Hydropower Station project.
TBEA has developed the first 720MW 500kV hydro-generator transformer in China, which is applied to hydropower projects.
TBEA provided a 500 kV cable system solution for the Pumped Storage Power Station, featuring a vertical cable channel drop of 270 meters.
TBEA provided a 500 kV cable system solution for the Pumped Storage Power Station, which is the largest one in the world by total installed capacity, delivering green power security for the Beijing Winter Olympics.
TBEA provided four main transformers for the Pumped Storage Power Station, which was awarded the “FIDIC 2021 Awards of Merit”.
TBEA provided four main transformers for the Hunan Heimifeng Pumped Storage Power Station.
TBEA provides an “electricity-hydrogen-electricity” system solution for the demonstration platform for the application of deep coupling technology of new energy-based hydrogen production.
Provide green power supply integration solution for the 200,000-ton annual high-purity silicon supporting “source-grid-load-storage integrated project”.
Provide one-stop solution for the source-grid-load-storage integrated photovoltaic demonstration project for 300,000-kW Grid Project.
Provide a “Desert-Gobi-Wasteland” solar storage system solution for the demonstration project.
TBEA provided offshore platform main transformer equipment and centralized control center primary equipment integration for the projects in Guangdong. The booster station capacity of the project is 1000MW.
TBEA supplied primary equipment for the offshore step-up station, main transformers for the onshore control center, and specially-designed energy extraction reactors for the offshore wind power project.
TBEA provided integrated development of primary equipment for Jiangsu Dafeng 300MW offshore wind power project and achieved mass supply.
TBEA provided a dedicated bus charging station system solution for the bus station in Hunan  Province, which can meet the charging needs of 150 buses simultaneously.
TBEA provided a charging station system solution for residential communities, capable of simultaneously charging 16 pure electric new energy vehicles of various types.
TBEA provided a dedicated bus charging station system solution for the bus station in Guangxi Province, which can satisfy the charging requirements of 32 buses at once.
TBEA provided a system solution for charging stations on highways and national/provincial roads, including the G107 Maintenance Center Charging Station.
TBEA provided a system solution for charging stations on highways and national/provincial roads, including the Lengshuitan Service Area Station on G55 Expressway.
TBEA provided a system solution for charging stations on highways and national/provincial roads, including the one located in Hengyang City, Hunan.
TBEA provided a dedicated bus charging station system solution for the bus station in Guangxi, accommodating simultaneous charging for 30 new energy vehicles.
TBEA provided power transformers, power cables, and computer cables for Giant DC’s Beijing-Tianjin Big Data Industrial Base in Tianjin.
TBEA provided 330 kV traction main transformer equipment for the Zhongwei-Lanzhou Passenger Dedicated Line project.
TBEA provided box-type substation equipment for the Yangquan–Shexian Railway electrification renovation project.
TBEA provided 220kV traction main transformer equipment for the newly-built Baotou-Yinchuan railway project.
TBEA provides 110kV traction main transformer equipment for railway electrification renovation and power through line projects.
TBEA provided 330 kV traction main transformer equipment for the newly constructed Xi'an-Yan'an Railway of Xi'an-Chengdu Railway Passenger Dedicated Line.
TBEA developed the industry's first 330 kV AT-powered traction transformer, which has been applied to the Zhengzhou-Xi'an Passenger Dedicated Line.
TBEA provided 220 kV transformers for New Energy monocrystalline wafer and high-efficiency battery project in the Zero-carbon Industrial Park.
TBEA provided rectifier transformers for Guangxi Aluminum Industry, a project with a production capacity of 1.3 million tons.
TBEA provided rectifier transformers for the Silicon Energy 200,000-ton high-purity polysilicon project.
TBEA independently developed the industry's first 1000kV UHV AC transformer and the industry's first 1000kV shunt reactor, which are applied in the Jindongnan-Nanyang-Jingmen 1000kV UHV AC test and demonstration project.
The ±800kV UHV DC converter transformer and the first ±800kV dry-type air-core bridge arm reactor developed by TBEA were applied to the Wudongde-Guangdong-Guangxi UHV multi-terminal DC demonstration project.
The industry's first ±1100kV UHV DC converter transformer developed by TBEA, and the ±1100kV UHV DC transmission project.
TBEA provides primary equipment for the offshore boosting station, main transformer for the onshore centralized control center, and energy extraction reactor for the Dafeng H8-2 offshore wind power project.
TBEA provided four main transformers for the Pumped Storage Power Station, which was awarded the “FIDIC 2021 Awards of Merit”.
TBEA provided  three main transformers for the Pumped Storage Power Station in Guangdong.
For the Jinsha River Xiluodu 18×770MW hydropower station unit project, TBEA provided 10 SSP-H-860000/550 main transformers.
For the Baihetan 16×1000MW hydropower station unit project, TBEA provided 50 DSP-375000/500 main transformers.
For the first phase of the 2×660,000 kW unit project of Xilinhaote Power Plant, TBEA provided six main transformers.
For the new 2×660MW ultra-supercritical coal-fired unit project of Xiantao Power Plant, TBEA will provide two main transformers.
For the 2×660MW unit project of Shengli Power Plant, TBEA provided six main transformers.
For the Kemen Phase III 2×1000MW coal-fired power project, TBEA provided two main transformers.
For the first phase of the 2×660,000 kW unit project of Xilinhaote Power Plant, TBEA provided six main transformers.
For the 2×1,000,000 kW coal-fired power generation project of Pingwei Power Plant Phase IV, TBEA provided six main transformers.
For the 2×660MW ultra-supercritical coal-fired unit project, TBEA  provided two main transformers.
For the new 2×660MW ultra-supercritical coal-fired unit project of Xiantao Power Plant, TBEA provided two main transformers.
TBEA provided two main transformers.
For the 2×660,000 kW unit project of the power plant, TBEA provided six main transformers.

最新动态